Reinforced soil with geogrid: an alternative to the concrete retaining wall
Last updated:
Soil that holds itself up. When reinforced soil replaces a retaining wall, why you design with LTDS and why water decides the outcome.
The system at a glance
Solutions & Applications · Geotechnics
A retaining wall holds the soil back. Reinforced soil makes the soil hold itself up. Layers of geogrid inside the fill turn a material with no tensile strength into a solid, flexible mass that stands at gradients impossible for a plain slope — with the ground itself as the main structural material.
How it works
Soil resists compression and friction, but almost no tension. When a steep slope tends to slide, the failure surface runs through soil that simply "opens up". Geogrid interrupts that mechanism:
- Interlock: fill particles wedge into the grid apertures and friction develops on both sides of every layer.
- Tension: each layer takes the force the soil cannot, and carries it behind the potential slip surface, into the stable zone.
- Weight: the reinforced block behaves as a single gravity wall — except that it is flexible and accepts deformation without cracking.
Concrete wall or reinforced soil?
| Concrete retaining wall | Reinforced soil with geogrid | |
|---|---|---|
| Main material | Concrete and steel | Granular fill — often from the project's own excavation — and geogrid |
| Behaviour | Rigid · sensitive to differential settlement | Flexible · tolerates settlement and deformation without cracking |
| Foundation | Footing with bearing-capacity requirements | The reinforced block spreads the load over a wide base |
| Construction | Formwork, reinforcement, pouring, curing time | Layers of fill and grid with ordinary earthmoving plant |
| Face | Concrete | Vegetated, gabions, stone or precast units |
| Water | Weep holes in the wall | Drainage behind and beneath the reinforced block |
| Where it wins | Limited space behind the face, low heights | Large heights and lengths, weak ground, remote sites, landslide repair |
The limit of reinforced soil is space: the geogrid needs length behind the face to anchor. On a narrow plot, with a boundary or a building a few metres behind the slope, a concrete wall may be the only option.
Uniaxial geogrid: you design with long-term strength
Soil reinforcement is loaded permanently, for the whole life of the structure. That is why the strength printed first on every data sheet — ultimate strength — is not the one used for design. The designer uses the long-term design strength (LTDS), which accounts for polymer creep, installation damage and exposure in the soil.
| ForGrid P Uniaxial | What is declared |
|---|---|
| Material | High-tenacity polyester (PET), low creep · elongation at break about 10 % |
| Strength in the machine direction (MD) | 40 to 600 kN/m, in 12 codes |
| Long-term strength | 120-year LTDS declared for every code (FHWA NHI-00-043) |
| Coating | Polymer coating for UV resistance and installation damage |
| Standards | Testing to EN ISO 10319 · reinforcement function to EN ISO 10318 |
| Rolls | 5.25 × 100 m (600/50: 5.25 × 50 m) |
| Applications | Reinforced-soil walls, steep reinforced slopes, bridge abutments and approach embankments, basal reinforcement on soft ground, landslide repair |
A uniaxial grid has its strength in one direction. It is always laid with the machine direction (MD) perpendicular to the face — a roll laid parallel to the wall reinforces nothing. The difference from biaxial grid, which works in road base courses, is covered in the solution on base-course reinforcement.
Reinforced soil rarely fails because the grid broke — it fails because water got in. A saturated fill develops pore pressure, loses friction with the grid and loads the face with thrust that was never foreseen. Drainage is not an add-on to the solution — it is part of the reinforcement.
The second critical point is the fill material. The same grid in clean, well-graded granular fill and in plastic clay produces two completely different structures. The design sets the fill — the site does not change it because something "turned up closer".
At ARGYNET we calculate geogrid quantities per layer and code from the design sections, together with separation geotextiles and drainage.
What the geotechnical design sets
| Check | What is examined |
|---|---|
| External stability | Sliding at the base, overturning, bearing capacity of the foundation soil, global stability of the slope including the reinforced block |
| Internal stability | Reinforcement rupture against LTDS and pull-out from the stable zone |
| Reinforcement geometry | Code per level, vertical layer spacing, anchorage lengths |
| Seismic | Additional thrust and inertial forces to Eurocode 8 |
| Water | Groundwater level, surface runoff, drainage layout |
| Crest loads | Road, building or construction loads above the reinforced block |
The inputs are the ground investigation — parameters of the foundation soil and the fill — and the LTDS of the code to be supplied. Substituting a code or supplier on site requires a re-check with its own declared LTDS.
Fill and separation
- Granular, well-graded fill with the design parameters. Fine-grained plastic soils retain water and reduce friction with the grid.
- Compaction in layers of the thickness set by the design. Near the face, light equipment — a heavy vibratory roller next to the face deforms it.
- Separation: NW Standard non-woven geotextile between the fill and the natural ground, or the drainage material, so fines do not migrate and clog the drainage.
Drainage is part of the reinforcement
- Base drain: a layer of drainage material beneath the reinforced block, with GEODRAIN PLUS perforated pipe — 360° perforation, factory-fitted 150 g/m² geotextile that retains fines, SN4 ring stiffness.
- Drain behind the block: a vertical drainage zone between the reinforced fill and the natural ground, wherever water flows out of the slope.
- Outfalls: the pipe takes water to outlets with a fall — not to a blind end.
- Crest: a ditch that diverts surface runoff before it enters the fill.
The face
| Face type | How it is built | When it is chosen |
|---|---|---|
| Wrap-around | The grid of each layer is folded back at the face and anchored in the next · often with temporary formwork | Green slopes, rural and forest roads, restoration |
| Vegetated | Topsoil at the face, with an erosion-control layer until vegetation is established | Where the face has to blend into the landscape |
| Gabions or stone | The face is built with the layers and connected to the reinforcement | Mountain and island works, rivers, a stone face |
| Precast units | Blocks or panels with the grid connected at every level | Urban works, vertical or near-vertical faces |
In every case the geogrid is not left permanently exposed. The polymer coating protects it during installation; over the life of the structure, protection is provided by the face.
When the problem is weight
On highly compressible ground, on a landslide that cannot take extra load, or behind a bridge abutment, the answer is not more reinforcement but less weight. EPS Geofoam weighs 0.5–2.5 % of conventional fill (EPS 100 ≈ 20 kg/m³), is certified to EN 14933 with CE marking and reduces thrust on abutments. It combines with reinforced soil where both are needed: a lightweight core, reinforced slopes at the sides. Its design is covered in the solution on base-course reinforcement.
Construction step by step
- Excavation and formation: to the design level, removing topsoil and unsuitable material.
- Base drainage: separation geotextile, drainage material and GEODRAIN PLUS with outfalls.
- First grid layer: cut to the design length, MD perpendicular to the face, laid flat and pulled taut so there are no wrinkles. No joints in the machine direction.
- Placing fill: plant runs on fill, never directly on the grid.
- Compaction in layers, with light equipment near the face.
- Face: wrap-around or connection to the facing unit at every layer.
- Repeat layer by layer, checking level and verticality.
- Crest: runoff ditch and final face protection.
Mistakes that cost
| Mistake | Consequence |
|---|---|
| Grid with MD parallel to the face | The strength is in the wrong direction — the block is effectively unreinforced |
| Designing with ultimate strength instead of LTDS | The reinforcement creeps over the years and the face bulges |
| Changing code or supplier without a re-check | Different LTDS, different structure |
| Clayey fill | Water retention, loss of friction, deformation |
| No drainage at the base and behind the block | Pore pressure and thrust the design did not foresee |
| Plant running on bare grid | Damage and displacement of the reinforcement before it is even loaded |
| Heavy roller at the face | Deformation and bellying of the face |
| Permanently exposed grid | UV ageing and vulnerability to fire and vandalism |
Design sequence
- Ground investigation: foundation soil, groundwater, available fill.
- Choice of solution: concrete, reinforced soil or lightweight fill, depending on space, height and ground.
- Sizing: external and internal stability, seismic, reinforcement codes and lengths.
- Drainage: base, rear zone, outfalls, crest.
- Face: facing type and connection detail.
- Material specification: code and declared LTDS, separation geotextile, drainage pipe.
- Construction control: compaction per layer, geometry, record of the codes installed.