IDER — Thermal and waterproofing insulation for a 2,000 m² flat roof
ESHA System · Ventilated waterproofing & cool roof

IDER — Thermal and waterproofing insulation for a 2,000 m² flat roof

Agios Stefanos, Attica2,000 m²4 months
IDER — Thermal and waterproofing insulation for a 2,000 m² flat roofIDER — Thermal and waterproofing insulation for a 2,000 m² flat roofIDER — Thermal and waterproofing insulation for a 2,000 m² flat roofIDER — Thermal and waterproofing insulation for a 2,000 m² flat roofIDER — Thermal and waterproofing insulation for a 2,000 m² flat roofIDER — Thermal and waterproofing insulation for a 2,000 m² flat roofIDER — Thermal and waterproofing insulation for a 2,000 m² flat roofIDER — Thermal and waterproofing insulation for a 2,000 m² flat roofIDER — Thermal and waterproofing insulation for a 2,000 m² flat roof

The Challenge

`PROJECT DETAILS

BuildingIDER facilities — offices & warehouses
LocationAgios Stefanos, Attica
Construction periodApril – July 2022
Flat roof area2,000 m²
Thermal insulationXPS 300 kPa, 7 cm thick
Project engineerCharalambos Papadimas
ARGYNET’s roleSupply of all materials

The building had two problems that are usually dealt with separately. Water was leaking in — in many places, above offices and storerooms located directly beneath the flat roof. And it had disproportionately high heating and cooling costs, for exactly the same reason: the flat roof was uninsulated.

The obvious solution — new thermal insulation and new waterproofing — is where the real difficulty begins.

To create a flat roof, the lightweight concrete is poured on top of the thermal insulation. That is, within the system, on top of the vapour barrier. Over 2,000 m², this means tonnes of construction water that cannot drain downwards — which is precisely what the vapour barrier prevents — and which will have nowhere to go upwards once the waterproofing membrane is bonded in place.

Two requirements:

The waterproofing must be completely continuous and bonded, otherwise rainwater will seep underneath it and reappear ten metres away from the point of entry.

The system beneath the waterproofing must be able to disperse moisture; otherwise, the first heatwave will turn it into steam and the membrane will blister.

With conventional full-surface bonding, these two requirements are mutually exclusive. And the schedule left no room for delay: the waterproofing was completed in July — the lightweight concrete was not going to have dried out completely at depth.`

The Solution

`The answer was not a single material. It was a layered system in which each layer solves a problem created by the previous one.

The layering of the site, from the slab upwards

#LayerRole
1High-pressure cleaningRemoval of loose material — a prerequisite for adhesion
2ESHACOAT — bituminous emulsionVapour barrier on the existing slab
3XPS 300 kPa, 7 cm, bonded with Ceresit CT 84Thermal insulation; foam also in the slab joints
4ESHA DTF geotextile 150 g/m²Separator / protective filter
5Lightweight concreteCreation of slopes — only across the surface, not at the joints
6ESHACOAT (2nd application)Impregnation & sealing of the lightweight concrete
7ESHASTICK TUBReinforcement of flat roof corners and parapets
8ESHATOPRIMERAdhesion primer
9ESHAPERFO — perforated membraneVapour pressure release layer — across the flat roof surface
10ESHADIEN ULTRAWHITE SBS 20 + ventsWaterproofing & cool roof
11ESHAGUM APP 10 + ESHABAR stripParapets — vertical surfaces
12ESHASEALER No1 · ESHA ACRYCOATLocalised reinforcements & protective coating

The layering of raised joints

#LayerFunction
1Closed-cell expanded polyethylene cordFilling the joint — and non-bonding zone
2ESHAFIN 3 kg/m² with PE film coatingBonded to the sides; left loose over the cord
3ESHAFIN 4 kg/m² with granulesFully bonded to the first layer
4ESHA ACRYCOATPaint applied over the granules

The waterproofing is fully bonded — yet still breathable

The crucial choice is layer 10. ESHAPERFO is a perforated bituminous membrane: the torch passes through the holes and bonds the overlying membrane at specific points, not across the entire surface. A continuous network of voids remains between the holes, spanning the entire 2,000 m².

Moisture from the lightweight concrete moves through this network, reaches the vents on the flat roof and escapes into the atmosphere. The membrane on top remains continuous and completely watertight — it is simply not bonded everywhere.

This same network performs a second function: it mechanically decouples the membrane from the movements of the substrate. Any contraction or expansion beneath the membrane is not directly transferred to the waterproofing.

This is not an improvisation by the contractor crew: ESHA explicitly specifies, in the ULTRA WHITE technical brochure, the application of a separating/vapour pressure release layer using ESHAPERFO or an equivalent method of isolating the waterproofing membrane, precisely to prevent water vapour condensation and localised stresses.

The opposite rule applies to raised joints

The flat roof joints are raised and have not been filled with lightweight concrete slopes. There is no construction water to be drained away there — so there is no need for a vapour pressure release layer. ESHAPERFO stops at this point.

The joint has its own problem, which is the opposite: thermal expansion and contraction. It is the part of the flat roof with the greatest movement and, as a raised element, is exposed to solar stress from more sides.

The solution lies in where the membrane does not adhere.

The closed-cell expanded polyethylene cord fills the joint. On top of this, ESHAFIN 3 kg/m² with a PE film coating was laid, bonded only to the two sides of the joint: it covers the cord but leaves it free underneath. This was followed by ESHAFIN 4 kg/m² with granules, fully bonded to the first layer.

The two membranes thus form a single composite sheet, anchored only on either side of the joint and free across the opening between them. When the joint opens and closes, the deformation is not concentrated at the line where the adhesive ends — which is precisely where the conventional solution fails. It is distributed across the entire width of the free section, and the waterproofing absorbs the movement through elongation rather than shear. The joint functions without any risk of delamination.

That is why the material is an elastomer (SBS) and not a plastomer: what is required here is not temperature resistance but elongation. Two layers instead of one, so that no single joint acts as the sole line of defence. The tile protects against ultraviolet radiation and was subsequently coated with ESHA ACRYCOAT.

The ARGYNET View In both cases, the fault is the same: uniform, complete bonding throughout. The surface requires partial bonding because it needs to release moisture. The joint requires controlled discontinuity because it needs to absorb movement.

The white surface works three ways

The top layer is ESHADIEN ULTRAWHITE SBS 20, a cool roof membrane with a Solar Reflectance Index (SRI) ≥ 87 according to ASTM E1980-01. Reflectivity reduces the building’s cooling load — this is the obvious benefit.

The top surface is not a mineral granulate but a triple-coated white polymer film. The difference is practical: the granules flake off over time and the flat roof gradually loses some of its protection, whilst the film retains a consistent white colour and does not suffer from the yellowing or chalking typical of polyurethane and acrylic liquid-applied coatings.

The second benefit concerns the waterproofing itself. On a flat roof, the membrane does not have the mass of concrete beneath it to absorb heat: the thermal insulation isolates it, and a dark surface reaches significantly higher temperatures than it would have on the same flat roof before insulation. A white surface keeps the temperature of the bituminous mass low, and with it, the rate at which it ages. The SBS modification complements the other end of the spectrum: flexibility down to −20 °C in accordance with EN 1109.

The third benefit had not yet been realised

IDER has planned the installation of bifacial photovoltaic panels on the flat roof. The choice of a white membrane was made with this in mind.

Photovoltaic panels lose efficiency as their operating temperature rises, and bifacial panels generate additional energy from the radiation reflected onto their rear side. Both benefit from a high substrate albedo. Research by Vasilakopoulou, Ulpiani, Khan, Synnefa and Santamouris quantifies the difference: every 0.1 increase in roof albedo yields approximately +0.7% output for single-sided panels and +4.5% for double-sided panels.

A dark bituminous surface is at the lower end of this scale. The white ‘cool roof’ membrane, with a certified SRI ≥ 87, is at the top of the scale. The exact magnitude of the benefit depends on the mounting height above the membrane, the geometry of the rows and the bifaciality coefficient of the panels — and will be determined by the installer’s study. However, the direction is clear, and the margin for double-sided panels is substantial.

The ARGYNET View The sequence of works forms part of the study. Waterproofing first, photovoltaics afterwards. Doing it the other way round means that any subsequent work on the flat roof will require the system to be dismantled — and this is usually postponed until damage occurs.

The parapets are not made of the same material

ESHAGUM APP 10 with a granule coating was installed around the perimeter. The APP plastomeric modification is chosen for vertical, exposed surfaces: it offers greater resistance to high temperatures and slipping. The granules protect against ultraviolet radiation.

After welding, the upper end was mechanically reinforced with an ESHABAR strip — on a vertical surface, the welded joint alone is permanently under tensile stress. Finally, it was painted with ESHA ACRYCOAT.

This was preceded by the installation of corner drains for the flat roof, and where deemed necessary, localised reinforcements were carried out using ESHASEALER No1.

ARGYNET MATERIALS

ESHACOAT — Bituminous emulsion Vapour barrier applied to the existing slab and, in a second application, sealing of the lightweight concrete. Quantity: 1814 kg

XPS material equivalent to FIBRANxps 300 | Flat roofs Flat roof thermal insulation, 7 cm thick. Compressive strength class CS(10) 300 kPa, λD 0.034 W/(m·K). Quantity: 2000 m²

Ceresit CT 84 — Low-expansion polyurethane foam Bonding of XPS boards and filling of the joints between them. Quantity: 216 pcs.

ESHA DTF — Non-woven polyester fibre geotextile 150 g/m² · separator between thermal insulation and lightweight concrete. Quantity: 2,200 m²

ESHASTICK TUB — Self-adhesive waterproofing tapes Corners of flat roof surfaces and parapets. Quantity: 660 m

ESHATOPRIMER — Primer for bonding bituminous membranes The entire surface was primed. Quantity: 680 litres

Joint-filling cords — closed-cell expanded polyethylene Filling of raised joints; defines the area where the membrane remains unconnected. Quantity: 430 m

ESHAFIN SBS -10 — Elastomeric bituminous membrane Two layers at the joints: 3 kg/m² with PE film overlay, bonded only to the sides of the joint, and 4 kg/m² with granules, fully bonded to the first layer. Quantity: 1750 m²

ESHAPERFO — Perforated bituminous membrane for the vapour pressure release layer Vapour pressure release layer on the flat roof, where there is a lightweight concrete slope. Quantity: 520 m²

ESHADIEN ULTRAWHITE SBS 20 — Cool roof Final waterproofing layer, applied using a torch. SBS elastomer, SP polyester reinforcement, 4.0 kg/m², top layer consisting of a triple-coated white polymer film. SRI ≥ 87. Quantity: 1750 m²

Flat roof vent Moisture extraction from the vapour pressure release layer. Quantity: 76 pcs.

ESHAGUM APP 10 — Plastomeric bituminous membrane Parapets, with granule coating. Quantity: 750 m²

ESHABAR bituminous membrane fixing strip Mechanical fixing of the upper end to the parapets. Quantity: 125 pcs.

Roof corner gutter on a flat roof Installed prior to waterproofing. Quantity: 23 pcs.

ESHASEALER No1 — Asphalt joint sealant Localised reinforcements. Quantity: 135 pcs.

ESHA ACRYCOAT — White acrylic sealant Apply over the mosaic tiles, on joints and parapets, as well as on locally reinforced areas. Quantity: 420 kg


CERTIFICATIONS & DOCUMENTATION

Specifications of the ESHADIEN ULTRA WHITE waterproofing membrane, as per the manufacturer’s technical data sheet (E1-2025).

StandardWhat it certifies
EN 13707Bituminous membranes for flat roof waterproofing — product conformity
CE No. 1020-CPR-010021423CE marking
ASTM E1980-01Solar Reflectance Index SRI ≥ 87
EN 1109Low-temperature flexibility: −20 °C
EN 1110High-temperature resistance: ≤ 110 °C
EN 1928Water permeability after 72 hours — passed
EN 12311-1Tensile strength 900/650 N/50 mm · elongation 50/60 %
EN 1849-1Weight 4.0 kg/m²
EN 12691 / EN 12730Resistance to dynamic and static puncture on concrete
EN 1107-1Dimensional stability ≤ −0.4 / +0.3 %
EPD — ECO Platform verifiedEnvironmental Product Declaration; contributes to LEED points

What does SRI mean in practice? The Solar Reflectance Index combines two properties — how much solar radiation the surface reflects and how easily it re-emits the heat it has absorbed. On a scale where standard black is 0 and standard white is 100, ULTRA WHITE is certified at ≥ 87.`

ARGYNET Materials

ESHACOATESHA DTFESHASTICK TUBESHATOPRIMERESHAPERFOESHADIEN ULTRAWHITE SBS 20ESHAGUM APP 10ESHASEALER No1ESHA ACRYCOAT

Result

2,000 m² of ventilated, thermally insulated, reflective surface in four months — April to July 2022. Project engineer: Charalambos Papadimas, in collaboration with ESHA’s technical department.

▸At least a 30% reduction in energy bills, according to IDER data
▸The problem of water ingress and damp on the flat roof and in the building has been completely eliminated
▸The progressive deterioration caused by damp in the structure has been halted
▸Working conditions in the offices and storerooms beneath the flat roof have been substantially improved
▸Moisture from the lightweight concrete structure is removed in a controlled manner via the vapour pressure release layer
▸The flat roof was handed over ready for the installation of double-sided photovoltaic panels

THE CONCLUSION When renovating a flat roof, the enemy is not just the rain. It is also the water that you trap inside the system on the day you waterproof it. A flat roof that is properly waterproofed but not ventilated will fail from the inside — and the failure will become apparent during the first heatwave, not the first rainfall.

However, the rule is not universal, and this is where the design comes into play. Ventilation where there is trapped moisture; controlled discontinuity where there is movement. In both cases, uniform, full-surface bonding — the contractor crew’s default choice — is the wrong approach.


CTA

Are you working on a similar project?

Send us the floor plan drawings. We’ll provide you with a quantity take-off, system specifications and certification documentation.

▸Quantity take-off based on drawings — DWG · DXF · PDF, within 48 hours
▸Technical design support — selection & specification
▸Trade supply for professionals — Athens & nationwide