How to install a dry construction partition correctly: thickness per CW stud, panel per space, filling with stone wool, construction steps and load-bearing capa

The system at a glance

Solutions & Applications · Dry Construction

An internal dry-construction wall is not a ‘cheap partition’. It is a system which, from a thickness of 7.5 cm, can achieve sound insulation, fire resistance and load-bearing capacity that a conventional brick wall of double the thickness cannot guarantee. The key question is not ‘which plasterboard should I use?’, but what the wall needs to do — and from this, the framework, the boards and the infill are determined.

What must the wall do?

RequirementFrameworkSlabSpacing
Simple partitionCW 50 / UW 50Type A, single layerStone wool for basic sound insulation
Bathroom · kitchenCW 50 or 75, thicker where tiles are to be laidType H2 · in the AQUAPANEL Indoor water zoneStone wool
Sound insulation between roomsCW 75 or 100, track membraneDouble layer · Piano DF, SilentboardSolid, dense stone wool
Fire protectionIn accordance with the certified systemDF, DFH2, Fireboard A1A1 stone wool
Heavy loadsUA or structural reinforcementULTRA BOARD, DiamantStone wool
Radiation protectionPer projectSAFEBOARD, lead-freePer project

The thickness is determined by the stud

The CW stud (EN 14195; 0.6 mm profiles also comply with DIN 18182 T1) is always fitted into a UW track of the same width. The width determines the permissible height, the space for insulation and penetrations, and, together with the layers, the final thickness:

FrameworkSingle layer 12.5 mmDouble layer 2×12.5 mmTrack membraneWhen
CW 50 / UW 5075 mm100 mm50 mmStandard partitions, low-rise buildings
CW 75 / UW 75100 mm125 mm70 mmHigher and sound-insulating walls, M&E penetrations
CW 100 / UW 100125 mm150 mm95 mmMaximum heights, sound insulation and fire resistance

For tall or load-bearing walls, CWs are installed in pairs, back-to-back. In door frames and openings, the UA reinforcement profile (2 mm), of the same width as the wall, is used.

The slab per room

  • Dry areas — Knauf Type A, the standard board in accordance with EN 520.
  • Wet areas — Type H2 damp-proofing; where the surface is directly exposed to water (shower), AQUAPANEL indoor cement board.
  • Fire protection — Type DF, moisture- and fire-resistant DFH2, and FIREBOARD (A1) for the most demanding systems.
  • Sound insulation — Piano DF and SILENTBOARD DFR: greater mass per m², better sound reduction.
  • Strength and loads — ULTRA BOARD DFIR and DIAMANT DFH1IR: hard surface, support for heavier loads.
  • Radiation protection — SAFEBOARD for medical facilities, lead-free.

Step-by-step construction

  1. Marking out on the floor and transferring to the ceiling using a laser level.
  2. Apply a track tape to the rear of each UW before fixing — this decouples the framework and seals the perimeter.
  3. UW tracks on floors, ceilings and walls, with fixing plugs in the load-bearing structure.
  4. CW studs within the UW, vertical, usually spaced 60 cm apart; more densely spaced where tiling or heavy loads are to be accommodated. Reinforcements and UA in the openings are now to be installed.
  5. Electrical and mechanical penetrations through the factory-made holes in the studs.
  6. First side: slabs vertical, joints on the stud. TN screws in 0.6 mm profiles, TB screws in UA profiles — length equal to the thickness of the slabs + ~10 mm.
  7. Stone wool that fills the entire cavity, with no gaps at the joints.
  8. Second side with joints offset in relation to the first; in a double layer, offset both from one another and between the layers.
  9. Joint filling with Fugenfüller Leicht and Kurt paper tape; in wet areas, use Uniflott moisture-resistant product. Finish with Super Finish.

Load distribution: the real question

The question ‘Will the cupboard hold?’ is answered in the design stage, not on site:

  • Light loads — metal plasterboard fixings: M6/58 for single-layer boards, M6/71 for double-layer boards.
  • Heavy loads (wall-hung cupboards, sanitary ware, large screens) — provision in the framework: UA, cross-braces or reinforcing elements within the wall, before the panels are screwed into place.
  • Walls subject to multiple loads — ULTRA BOARD, which provides the strength of fibreboard when fitted with plasterboard.
ARGYNET Note

Performance values (EI, Rw) are not derived from the materials individually, but from the certified system as a whole: panel, thickness and number of layers, stud type and width, spacing, infill, screws, sealing. Changing any one element invalidates the test.

At ARGYNET, we specify the system based on the intended use of the space and calculate materials per m²: slabs, profiles, insulation, screws and jointing materials.

Mistakes that cost

IncorrectConsistency
No reinforcement for loads before the wall is closed upRemoval of slabs or cupboards that are unstable
Leave a void where sound insulation is requiredThe wall acts as a drum
No track tape; unsealed perimeterSound and fire pass through the perimeter
UW and CW of different widthsUnstable framework, crooked walls
Joints in a straight line on both sidesCracks and sound bridges
Type A in a bathroomBlistering and mould on the slab

Framework & Fixing

Plasterboard & Cement boards

Cavity Insulation, Screws & Jointing

Related Solutions from ARGYNET LAB

Are you designing internal partitions? Tell us the intended use — we’ll specify the system.

Request a Technical Quotation

Need a materials proposal for your project?

Send us your request and we will get back to you.